Menu
  • Home
  • West Buckland
    • TRAIN RIDES AT WEST BUCKLAND
    • West Buckland work in progress Photos Current date - 04/09/2025
    • West Buckland work in progress photos 13/06/2024-28/08/2025
    • Video Level Crossing 1st Test
    • signalling - External link to Jon Freeman's website
    • West Buckland Plan
  • Train Rides at Vivary
  • Members
    • renew membership and Club bank details
    • TME Publication
    • Clothing
    • Club Drawings
    • Links
    • Sales and Wants
    • News Sheets
  • Events
    • CLUBLEC
    • Gallery
    • Video Gallery
    • Accident Report Form
  • Oily Rag Mag
    • Oily Rag Awards
  • WhatsApp Group
  • Contact Us
    • About Us
Menu
  • Home
  • West Buckland
    • Train Rides at West Buckland
    • West Buckland work in progress Photos Current date - 04/09/2025
    • West Buckland work in progress photos 13/06/2024-28/08/2025
    • Video level crossing 1st Test
    • Signalling - External link to Jon Freeman's website
    • West Buckland Plan
  • Vivary Train Rides
  • Members
    • renew membership and Club bank details
    • TME Publication
    • Clothing
    • Club Drawings
    • Links
    • Sales and Wants
    • News Sheets
  • Events
    • CLUBLEC
    • Gallery
    • Video Gallery
    • Accident Report Form
  • Oily Rag Mag
    • Oily Rag Awards
  • WhatsApp Group
  • Contact Us
  • About Us
Facebook

Current work in progress. (Click on image to enlarge and view titles)

Person standing on scaffolding working on the decorative trim of a green metal building with a brick base. Construction site with yellow dumper, excavator, and railway track under construction in a rural area Outdoor view of workshop with two Mitsubishi air conditioning units mounted on the exterior wall Group of older men examining items on tables in a room with white walls and air conditioning units A man giving a technical demonstration to an audience in a classroom or workshop setting. 25/09/2025  A new gate installed to prevent unauthorised access to the running lines. Metal building with green corrugated walls, brick base, and a flat overhanging awning above a doorway. Green metal building with metal awning under construction, scaffolding, picnic benches, grassy area, and a person sitting outside. Close-up of a metal hinge mechanism attached to a wooden platform with a red utility knife nearby Construction site with a hole in the ground, concrete foundation, and scattered construction tools. 18/09/2025 The remote point position indicator painted to show the selected route. 18/09/2025 The suspended ceiling in the meeting room completed. 18/09/2025 The tent emptied, and the concrete sleepers moved, to make further space available for car parking. Interior of a room under construction with ladders, scaffolding, and construction materials. Two people in a room with a partially installed suspended ceiling and various furniture and equipment scattered around.
Newsletter Sign up
Join our mailing list
Sign up to our newsletter to receive updates and correspondence from us. We never sell on data or contact details. Please see our privacy policy for more information.
Get in touch Taunton Model Engineers Meteor House Culmhead Business Centre Culmhead, Taunton Somerset TA3 7DY
Facebook
©2025 Taunton Model Engineers | All Rights Reserved.
Website Powered by Clockwork Marketing