Menu
  • Home
  • West Buckland
    • TRAIN RIDES AT WEST BUCKLAND
    • West Buckland Photos work in progress current date - 01/09/2026
      • West Buckland work in progress Photos 04/09/2025 - 31/08/2026
      • West Buckland work in progress photos 13/06/2024-28/08/2025
    • signalling - External link to Jon Freeman's website
    • West Buckland Plan
    • Video Level Crossing 1st Test
  • Train Rides at Vivary
  • Members
    • renew membership and Club bank details
    • TME Publication
    • Clothing
    • Club Drawings
    • Links
    • Sales and Wants
      • EXE Lathe for Sale
    • News Sheets
  • Events
    • CLUBLEC
    • Gallery
    • Video Gallery
    • Accident Report Form
  • Oily Rag Mag
    • Oily Rag Awards
  • WhatsApp Group
  • Contact Us
    • About Us
Menu
  • Home
  • West Buckland
    • Train Rides at West Buckland
    • West Buckland work in progress Photos 04/09/2025 - 31/08/2026
    • West Buckland work in progress photos 13/06/2024-28/08/2025
    • Video level crossing 1st Test
    • Signalling - External link to Jon Freeman's website
    • West Buckland Plan
  • Vivary Train Rides
  • Members
    • renew membership and Club bank details
    • TME Publication
    • Clothing
    • Club Drawings
    • Links
    • Sales and Wants
      • EXE Lathe for Sale
    • News Sheets
  • Events
    • CLUBLEC
    • Gallery
    • Video Gallery
    • Accident Report Form
  • Oily Rag Mag
    • Oily Rag Awards
  • WhatsApp Group
  • Contact Us
  • About Us
Facebook

West Buckland development, current date - 01/09/2026 (Click on image to enlarge and view titles)

17/09/2026 A jig made by Dave Wood to accurately position the top and bottom support plates of the footbridge columns for welding. 17/09/2026 A jig made by Dave Wood to accurately position the top and bottom support plates of the footbridge columns for welding. 17/09/2026 With the top and bottom support plates welded in place, the uprights, cross members and tie bars are laid out in a wooden jig for welding. 17/09/2026 Once the initial welds are made the assembly is removed from the jig to allow access to both sides for welding. 17/09/2026 The completed 5 sets of uprights put away under cover until the next working party. 17/09/2026 The electricians  wiring in the cable for the tunnel sump pump into the local distribution board. 17/09/2026  The ground around the middle manhole had to be shuttered first to allow the hired mini dumper to get passed without collapsing the sides of the trench. 17/09/2026  The mini dumper had a rotatable bucket which was ideal for depositing the concrete in the correct position with the minimum of manual effort. 17/09/2026  The mini dumper had a rotatable bucket which was ideal for depositing the concrete in the correct position with the minimum of manual effort.
Newsletter Sign up
Join our mailing list
Sign up to our newsletter to receive updates and correspondence from us. We never sell on data or contact details. Please see our privacy policy for more information.
Get in touch Taunton Model Engineers Meteor House Culmhead Business Centre Culmhead, Taunton Somerset TA3 7DY
Facebook
©2026 Taunton Model Engineers | All Rights Reserved.
Website Powered by Clockwork Marketing