Menu
  • Home
  • West Buckland
    • TRAIN RIDES AT WEST BUCKLAND
    • West Buckland work in progress photos
    • Video Level Crossing 1st Test
    • signalling - External link to Jon Freeman's website
    • West Buckland Plan
  • Train Rides at Vivary
  • Members
    • TME Publication
    • Clothing
    • Club Drawings
    • Links
    • Sales and Wants
    • News Sheets
  • Events
    • CLUBLEC
    • Gallery
    • Video Gallery
    • Accident Report Form
  • Oily Rag Mag
    • Oily Rag Awards
  • WhatsApp Group
  • Contact Us
    • About Us
Menu
  • Home
  • West Buckland
    • Train Rides at West Buckland
    • WORK IN PROGRESS PHOTOS
    • Video level crossing 1st Test
    • Signalling - External link to Jon Freeman's website
    • West Buckland Plan
  • Vivary Train Rides
  • Members
    • TME Publication
    • Clothing
    • Club Drawings
    • Links
    • Sales and Wants
    • News Sheets
  • Events
    • CLUBLEC
    • Gallery
    • Video Gallery
    • Accident Report Form
  • Oily Rag Mag
    • Oily Rag Awards
  • WhatsApp Group
  • Contact Us
  • About Us
Facebook

Current work in progress. (Click on image to enlarge and view titles)

28/8/25 The installation of the suspended ceiling in the club house proceeding. 28/8/25 The loco off loading ramp next to the club house being raised to make off loading easier. 24/8/25 A very good turn out for the public running day. 24/8/25 Loco’s being prepared for the public running. 24/8/25 Loco’s being prepared for the public running. 21/8/25 Preparations under way for the upcoming public running day. 21/8/25 The completed  concreting of the inspection chamber next to the main entrance gates. 14/08/2025  New carriages being constructed 14/08/2025 Work on the new carriage bogies continues 14/08/2025 The ground level track platform extension 14/08/2025  Installation of ducting and draw pit for the car park lighting. 14/08/2025 The suspended ceiling in the centre of the meeting room completed. 10/08/2025 The installation completed of the side supports for the suspended ceiling. 10/08/2025  The installation of the side supports for the suspended ceiling in progress. 07/08/2025 Supporting cross beams for the suspended ceiling grid installed in the centre section of the meeting room. 07/08/2025 The shuttering in place for the next phase of the ground level platform. 07/08/2025 Some additional picnic tables gifted to the club, formally residing on the beach at Teignmouth. 05/08/2025 The annual club BBQ. 31/07/2025 The new carriage bogies under construction. 31/07/2025 The raised track platform viewed from the opposite end with the ramp already in place. 31/07/2025 The fencing being installed around the edge of the ground level track. 31/07/2025 The ramp being laid at one end of the raised track platform. 31/07/2025 Work has started on the suspended ceiling for the meeting room, with the first brackets being attached to the roof. 31/07/2025 The new doors for the raised track carriage shed painted and secured. 10/07/2025 The new club loco ‘Ivy May’ successfully undergoing a boiler pressure test to confirm that is all ok. 10/07/2025 The first half of the raised track platform completed, and the shuttering positioned to cast the next section when the weather cools down a bit. 03/07/2025 Attempting to ‘un-seize’ the dumper truck engine, only to find that the starter motor had jammed and all was well. 03/07/2025 The first section of the raised track platform being cast. 26/06/2025 The portable track laid in the West Buckland village hall sports field ready for the village fete this Saturday. 26/06/2025 The shuttering put in place to make the first part of the platform for the raised level track. 26/06/2025  The raised level track with the new end door in place. 05/06/2025 Mass construction of picket fencing in progress. 05/06/2025 Both containers now moved to the end of the site 05/06/2025 The turntable turnout concreting almost complete 05/06/2025 Concreting of the turntable turnout. 05/06/2025  Modifications to the point levers 05/06/2025  The site on a warm summers day. 05/06/2025  The site on a warm summers day. 15/05/2025 The embankment alongside School Lane repaired, kerbs replaced and re-ballasted. 15/05/2025 The new door from the meeting room into the workshop installed. 15/05/2025 The new tarmac between the traverser rails. 15/05/2025 The end of the new moveable track into the raised track carriage shed 13/05/2025  Members running evening. 24/04/2025 The air compressor being connected up. 24/04/2025 The end of the car park cleared to make additional car parking spaces, with the pads for the containers all ready for the big move. 24/04/2025  The pneumatics to the traverser being installed. 24/04/2025  The pneumatics to the traverser being installed. 17/04/2025  The final pad for the containers cast and protected from the rain. The area between the remaining pads and centre section being levelled up. 10/04/2025 The air compressor has been fitted in position, now waiting on the sparkies to connect it up. 10/04/2025 The cladding in the signal box is nearing completion. 10/04/2025 The new centre concrete pad has been completed, and now 4 further smaller pads on either side are to be concreted to take the two containers. 10/04/2025 The new centre concrete pad has been completed, and now 4 further smaller pads on either side are to be concreted to take the two containers. 27/03/2025 The slabs for the picnic tables all completed. 27/03/2025 The area around the level crossing now devoid of sand/cement and looking much tidier. 27/03/2025 The second window now installed in the meeting room. 27/03/2025 The compressor house structure now complete along with a door. 27/03/2025 The cladding on the raised track carriage shed almost complete. 27/03/2025  A new concrete slab made to park the dumper truck on (or a dedicated parking space for the Chairman?). The containers will be relocated either side of the slab. 27/03/2025 The cement production facility has now been transferred to the far end of the car park. 20/03/2025 Following a delivery of 20 Tonnes of stone, the western end of the car park has been extended to accommodate the containers and additional car parking spaces. 20/03/2025 The last of the concrete pads cast for the picnic tables. 20/03/2025 The first of the windows installed in the meeting room. 20/03/2025 The first of the windows installed in the meeting room. 13/03/2025  the roof cladding being installed on the ground level carriage shed. 13/03/2025  the interior cladding of the signal box. 13/03/2025 the last of the hard standings for the picnic tables being prepared. 13/03/2025 the sector plate leading to the ground level carriage shed. 13/03/2025 the ticket office signage in place. 06/003/2025  A third concrete pad being constructed for a picnic table. 06/03/2025 The floor is complete in the meeting room, with the skirting boards and architraves being installed. 06/03/2025  Two concrete pads completed on which to sit the picnic tables. 13/02/2025  the floor being laid in the meeting room. 13/02/2025 hard standings being constructed for the picnic tables. 13/02/2025  new operating levers being fitted to the points. 30/01/2025 new steps being constructed down to the steaming bays. 30/01/2025 new steps being constructed down to the steaming bays. 30/01/2025 the meeting room plastering completed. 18/01/2025 Loading bays 18/01/2025 Signal box internal cladding 18/01/2025 plasterboarding 19/12/2024 High level plasterboard being installed. 12/12/2024 The last of the stud walling erected in the meeting room. 12/12/2024 The last of the stud walling erected in the meeting room. 28/11/2024 The south wall of the meeting room with the joints filled on the plasterboard awaiting rubbing down. 28/11/2024 The stud walling being erected on the north wall of the meeting room. 28/11/2024 The north wall of the meeting with completed plasterboard. 14/11/2024 The cladding of the compressor house continues. 14/11/2024 The last of the kerbing being positioned at the end of the traverser. 14/11/2024 The insulation and plasterboard installed on the meeting room wall. 07/11/2024 The compressor house taking shape. 07/11/2024 The compressor house taking shape. 07/11/2024 The framework for the meeting room wall erected. 07/11/2024 The framework for the meeting room wall erected. 03/10/2024 The ground around the edge of the steaming bays raised and levelled prior to the installation of the changeover mechanism to the carriage shed. 03/10/2024 A new hardstanding cast at the end of the raised track carriage shed to take the changeover mechanism from the traverser. 03/10/2024 The first of the operating levers mounted in the signal box, and the first trial operation of the crossing gates carried successfully out using the pneumatics. 19/09/2024  The ground level around part of the raised track being raised using spare topsoil. 19/09/2024 Another draw pit completed adjacent to the carriage shed. 12/09/2024 Brean Steamers Visit 12/09/2024 Brean Steamers Visit 12/09/2024 Brean Steamers Visit IMG_8561 IMG_8560 IMG_8521 IMG_8492 IMG_8491 IMG_8498 IMG_8502 image3 IMG_8195 IMG_8153 IMG_8152 IMG_8150 IMG_7811 IMG_7820 IMG_7822 IMG_7823 IMG_7721 IMG_7714 IMG_7713 IMG_7711 04/07/2024 The plasterboard being fitted to the partition wall. IMG_7640 IMG_7634 IMG_7635 IMG_7632 IMG_7641 Further progress on the signal box 21/06/24 All of the noggins cut and fitted and the first plasterboard panels being fitted. 21/06/24 All of the noggins cut and fitted and the first plasterboard panels being fitted. 21/06/24 All of the track into the carriage shed now in place. 21/06/24 The workshop floor extension in place with the start being made on the partition wall. The new ticket office in place.   21/06/24 The steaming bays for the raised track being welded up 21/06/24 The new club portable track being painted 21/06/24 The side cladding sheets being placed on the ground level carriage shed. The signal box build continues.  13/06/2024 The partition wall erected between the meeting room and workshop. 13/06/2024 The new(?) dumper truck being renovate 13/06/2024
Newsletter Sign up
Join our mailing list
Sign up to our newsletter to receive updates and correspondence from us. We never sell on data or contact details. Please see our privacy policy for more information.
Get in touch Taunton Model Engineers Meteor House Culmhead Business Centre Culmhead, Taunton Somerset TA3 7DY
Facebook
©2025 Taunton Model Engineers | All Rights Reserved.
Website Powered by Clockwork Marketing