2006 - 2008 Progress at Creech St. Michael
Alan's new loco
New loco on new track
Trolly chassis
Trolly bodies
Constructing passenger trolly frames
Passenger trolly bodies
Checking gradient
Point sections
Checking the gradient
Point sections being laid
Rolling stock shed
Ticket office
Completed rolling stock shed
Ticket office
Waterpipe trench from pavillion to track
Oh go on - let's have a go !
Platform extension
I get all the good jobs
That shouldn't be there
It should be here
Start of the cutting for phase 2
Work continued on Phase Two of the Track ground work but the heavy rains in late 2008 resulted in flooding the newly dug cutting, the final works in 2008 consisted of digging a trench and laying a land drain to get the water away from the cutting.
December frosts did not deter the track layers
Work was put on hold at Creech in the early part of 2009 as all hands turned out to get the extension to the raised track in Vivary Park ready for the running season. at Creech.
Final ground work preparations for the return track.